Hey guys, so did a quick search with not much on here about upgrading fuel system.
So the fuel pump has been on the fritz and I decided it was time to replace it with a walbro 255 ( Yes I bought it from meek to be sure )
Removed the rear seats, brackets, front seat, pulled the carpet all the usual stuff, unbolted everything except for the main fuel line.
Whoever did it up last was a bigger gorilla than me because I've kinked the bloody steel outlet line and rounded the nut off with flare nut spanners...
So my thoughts are bugger it, while i'm there fixing that I should just replace everything and be done with it.
So being new to all things fuel, I've done some research and narrowed it down to a running AN fittings, size 6 for now. Apparently they are good for 400-600 HP which is way more than I'll need.
I'm looking at this kit http://www.streettunedmotorsports.com/parts/stm_dsm_fuel_tank_to_rail_kit.htm as it seems to have all I need.
Has anyone else done it with other suggestions?
Is 6AN enough?
My plan is to use the exisiting pump plate, drill out the current steel lines and weld/replace them with screw fittings.
That way it's all "factory" without too much headache.
Your thoughts would be much appreciated.
So the fuel pump has been on the fritz and I decided it was time to replace it with a walbro 255 ( Yes I bought it from meek to be sure )
Removed the rear seats, brackets, front seat, pulled the carpet all the usual stuff, unbolted everything except for the main fuel line.
Whoever did it up last was a bigger gorilla than me because I've kinked the bloody steel outlet line and rounded the nut off with flare nut spanners...
So my thoughts are bugger it, while i'm there fixing that I should just replace everything and be done with it.
So being new to all things fuel, I've done some research and narrowed it down to a running AN fittings, size 6 for now. Apparently they are good for 400-600 HP which is way more than I'll need.
I'm looking at this kit http://www.streettunedmotorsports.com/parts/stm_dsm_fuel_tank_to_rail_kit.htm as it seems to have all I need.
Has anyone else done it with other suggestions?
Is 6AN enough?
My plan is to use the exisiting pump plate, drill out the current steel lines and weld/replace them with screw fittings.
That way it's all "factory" without too much headache.
Your thoughts would be much appreciated.