Was the only thange the varex or did u change the rest of the sytem as well, so going from a 3" strait pipe, to adding a 3" varex on the end was a 50kw loss?
The cannon one ive looked at, when its open its strait through the only restriction is the butterfly in the middle, its that worth 50kw?